Library NewsGo To Main Menu

Replacement of Outdoor Wall Tiles at Ma On Shan Public Library [Expected Works Period: 20.12.2024-19.12.2025]

.

20.12.2024

Due to safety concern, replacement works of outdoor wall tiles will be carried out in phases at Ma On Shan Library starting from 20 December 2024. The works are expected to last for around twelve months (including the extended opening hours of Students’ Study Room from March to May 2025). Severe and continuous noise will likely occur during the works period, the contractor will try to control noise, dust and other nuisances arising from the works to within established standards and guidelines. You may consider to use other study rooms or public libraries if required. We apologise for any inconvenience this may cause.

 

Information of Public Libraries at Sha Tin District

https://www.hkpl.gov.hk/en/locations/sha-tin/libraries.html

 

Information of Students’ Study Room (by EDB)

https://www.edb.gov.hk/en/student-parents/parents-related/students-related/study-rooms/index.html